[ 01 ] Architecture

One runtime.
Zero middleware tax.

Most "manufacturing platforms" sit four layers deep — PLC, historian, SCADA, integration broker, application. Each hop adds latency, fragility, and an invoice. Veltrix collapses the stack: a single edge runtime that reads your PLCs natively and runs every module on top.

  • PROTO
    Native PLC protocols OPC-UA, EtherNet/IP, Modbus TCP, Siemens S7, Profinet. We speak the protocols your controls team already trusts.
  • EDGE
    Edge-first, cloud-optional The platform runs at the line on commodity hardware. If the WAN drops, your operators don't notice. Cloud sync is a benefit, never a dependency.
  • DATA
    Open data, your schema Read-only by default. Standard SQL, REST, and MQTT egress. No proprietary lock-in, no per-tag licensing, no vendor moat.
  • SEC
    OT-safe by design Outbound-only connections, signed updates, role-based access. Designed to pass IT/OT security reviews the first time.
STACK // VELTRIX LIVE
PLC LINE 1 PLC LINE 2 PLC CELLS VELTRIX EDGE RUNTIME · PLC-DIRECT OPC-UA · EtherNet/IP · Modbus · S7 OEE live · per-line QUALITY AI vision · no-code MATERIALS JIT · auto-order OPERATOR HMI · SUPERVISOR DASH · ERP / SAP
0%
PLC-Direct
0
PLC Protocols Native
0wk
First Module Live
0
Vendor Lock-In
[ 02 ] How We Deploy

Software that ships,
not slideware.

Most platform engagements drag for quarters before anyone sees a screen on the floor. We run a tight four-step rollout that puts a working module in operators' hands inside two weeks.

01

Connect

WEEK 1 · 3-5 DAYS
Edge runtime installed at the line. We map your PLC tags together with your controls engineer in a working session — no requirements doc, no procurement cycle for a third-party historian.
02

Configure

WEEK 2 · 5-7 DAYS
The first module — usually OEE — is configured for your lines: shifts, downtime codes, asset hierarchy. Operators see live data on a tablet at the line before the week is out.
03

Roll out

WEEKS 3-6
Additional modules and additional lines come online one at a time, in priority order. Your success manager is on-site for the first cell in each new module.
04

Compound

ONGOING
Weekly reviews of OEE, defect, and consumption trends — with recommendations, not just charts. Every quarter we revisit the deployment against the outcomes we committed to.

Want to see the runtime connect to your PLCs?

Book a Demo